EQUIPMENT BASES • RIYADH
Equipment Bases & Concrete Pedestals Contractor in Riyadh
Equipment bases are not just a concrete volume; installation depends on approved equipment dimensions, anchors, loads, levels, service interfaces and steel coordination. ERAMCO reviews Riyadh equipment-base, pedestal and upstand packages with survey and embedded-item responsibilities defined before the pour.
Base information before execution
Each base needs a clear equipment, anchor and level reference before formwork and reinforcement are finalised.
- Approved equipment dimensions
- Anchor-bolt layout and template
- Loads and structural details
- MEP and steel interface coordinates
Survey accuracy and as-built control
Small anchor or level deviations can affect equipment installation, so pours should be tied to clear survey checks.
- Setting out before reinforcement
- Anchor checks before concrete
- Level and orientation control
- As-built documentation where required
Commercial boundaries
Anchor supply, templates, grout, breaking, modifications, protection and non-shrink grout should be explicitly included or excluded.